Re: Creating user stories in Scrum4TS - Scrum for Team System
Welcome to Scrum for Team System Sign in | Join

Scrum for Team System - Feature Requests

Started by rabashani at 09-29-2007 1:52 PM. Topic has 2 replies.

Print Search
Sort Posts:    
   09-29-2007, 1:52 PM
rabashani is not online. Last active: 3/9/2008 9:14:35 PM rabashani

Top 100 Posts
Joined on 09-29-2007
Posts 5
Creating user stories in Scrum4TS
as a product manager
I want to have the ability to create User stories in TS
so that we can manage our user stories there instead of manual cards

   Report 
   05-22-2008, 7:04 PM
DylanSmith is not online. Last active: 5/14/2008 8:17:25 PM DylanSmith

Top 150 Posts
Joined on 05-14-2008
Posts 4
Re: Creating user stories in Scrum4TS
Does the Product Backlog Item Work Item Type not satisfy this requirement for you?  If no, why?
   Report 
   09-08-2008, 4:29 PM
Scrummaster is not online. Last active: 9/25/2008 2:49:55 PM Scrummaster

Top 75 Posts
Joined on 07-28-2008
Posts 8
Re: Creating user stories in Scrum4TS
there is a variety of tools available on the market that have the capability for creating user stories and im/exporting those into TFS´. The challenge will be to map those stories to the correct entities used within the SCRUM template... we are currently looking into the same direction as our PO's also require a tool to design user stories, create storybóards and define test requirements (qaulity criteria). as soon as we have decided for a tool to help us with this, i will keep you posted (in about 2 months).
cheers
joe
   Report 
Scrum for Team ... » Scrum for Team ... » Scrum for Team ... » Re: Creating user stories in Scrum4TS

Powered by Community Server, by Telligent Systems